Case Study

Rainford High, St Helens – Pumping Station Upgrade

Project:

Pumping station replacement

Branch:

Manchester

Project type:

System Upgrades

Sector:

Education

Pump Action successfully completed the replacement of a damaged GRP pumping station chamber, installing a durable new concrete ring chamber in its place.

The works were carefully scheduled outside of term time to minimise disruption to the site’s day-to-day operations and ensure the project could be completed with minimal impact.

Requirements:

The existing GRP chamber had sustained internal damage and required full excavation and replacement. All pipework, pumps and controls needed to be removed beforehand, with the new chamber constructed in the same location to retain the existing rising main.

The replacement chamber was built to a depth of 3000mm, providing the required storage capacity for the pumping station.

Approach:

Our team excavated and removed the existing GRP chamber before installing a reinforced concrete base. The new chamber was constructed using concrete rings, a concrete surround, a new top slab and manhole cover.

Our confined space-trained team then completed the internal rebuild, including the installation of new pipework, guide rails, controls and pumps. The works were followed by site reinstatement, a Jetvac clean and full testing and commissioning.

By scheduling the project outside of term time, we were able to minimise disruption while carrying out the necessary replacement works safely and efficiently.

Outcome:

The project was successfully completed, with the damaged GRP chamber replaced by a robust concrete structure and the pumping station returned to full operation. All internal components were reinstated, with testing and commissioning completed to ensure the system was operating as required.

Benefits:

  • Replaced damaged GRP chamber with durable concrete construction
  • Reused the existing rising main, avoiding unnecessary alterations
  • Installed a reinforced concrete base to support internal pipework and equipment
  • 3000mm chamber depth providing the required storage capacity
  • Specialist confined space team completing the internal rebuild
  • Works scheduled outside of term time to minimise disruption
  • Full cleaning, testing and commissioning completed

What we used:

Read more...

St Mary’s Hospital, Warrington – Emergency Pump Replacement
Reflex Thermal Expansion Upgrade for Bonnyrigg District Heating Network
New Pumping Station Installation at Hop Processing Facility
Private water supply pump installation
Restoring water to Birmingham’s tallest residential building
Energy-efficient pump upgrade at The Pyramids

Ready for your next career move?

Join a team where your skills are valued and your future matters.

Explore engineering career opportunities at Pump Action and discover how you can grow with us.

Get in touch

Enquire Now

Fill in your details below and a member of our team will be in touch to discuss your requirements.