Case Study

24/7 Response in action: Restoring water supply

Project:

Out of Hours Breakdown

Branch:

Glasgow

Project type:

Repair

Sector:

Residential, Facilities Management

A call-out from Alba Facilities reported a complete loss of water supply to a residential block, requiring urgent out-of-hours attendance to assess and restore the system.

Origin:

A call-out was received from Alba Facilities reporting a complete loss of water supply to a residential block of flats. Due to the critical nature of the issue and the impact on residents, an urgent attendance was requested to investigate and restore the water system as quickly as possible.

An engineer was therefore required to attend site out of hours to assess the condition of the existing cold water booster set, identify the cause of failure and determine the most effective solution to reinstate the water supply.

Approach:

Our on-call engineer was contacted by the Glasgow service team and attended site without delay. Upon inspection, it was quickly identified that the existing booster set was beyond economical repair and required full replacement.

The attending engineer immediately liaised with our internal team, contacting Craig Ralston to confirm stock availability. A suitable replacement, a DAB ESYBOX MAX booster set, was identified in stock and confirmed to meet the required duty for the site.

Following this, the customer’s project manager was informed of the situation and provided with a recommended course of action. Upon receiving authorisation, an additional Pump Action engineer was deployed to site to support the installation.

Working through the night, our engineers safely removed the failed booster set and installed and commissioned the new system. This ensured the water supply was fully restored to the residential block with minimal disruption, leaving both the residents and the customer satisfied with the outcome.

Benefits:

  • Rapid response and out-of-hours attendance minimised downtime
  • Swift identification and implementation of the most effective solution
  • Access to in-stock equipment enabled immediate replacement and faster resolution
  • Seamless coordination between engineering and internal teams ensured efficient delivery
  • Water supply restored quickly, maintaining resident comfort and satisfaction

What we used:

Read more...

Restoring water to Birmingham’s tallest residential building
Energy-efficient pump upgrade at The Pyramids
Efficiency savings at The Reach Liverpool
30% energy savings at Exchange Plaza
A reliable rainwater solution for retail premises
Authorised service support for efficient factorisation system performance

Get in touch

Enquire Now

Fill in your details below and a member of our team will be in touch to discuss your requirements.